Download VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design.3V0-624.CertDumps.2019-07-26.35q.vcex

Vendor: VMware
Exam Code: 3V0-624
Exam Name: VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design
Date: Jul 26, 2019
File Size: 3 MB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Demo Questions

Question 1
A company has requested that a new vSphere 6.5 design be created:
  • The existing environment consists of 32 vSphere 6.0 hosts attached to an iSCSI storage array.
  • The storage arrays contain external customer financial and medical records used by the company's investment and medical services division.
The design must:
  • protect the company's existing data center investment
  • expand to a second data center site
  • introduce process automation
  • expand to and fail over to public cloud
Which two non-functional requirements are applicable for this design? (Choose two.)
  1. The product of the design must account for regulatory compliance. 
  2. The automation solution must be compatible with the existing equipment. 
  3. The product of the design must feature 3DES encryption at the virtual machine disk level. 
  4. At least two 10Gbps interfaces must be dedicated to storage on each host. 
  5. Every host in the design must have Lockdown Mode enabled for security.
Correct answer: CD
Question 2
A customs has requested a vSphere 6.5 deployment design where ESXi hosts are provisioned with Auto Deploy. The customer requires that certificates can be automatically refreshed and renewed from the vSphere Web Client for ESXi hosts. Which certificate policy should be configured for vCenter Server?
  1. Thumbprint Mode 
  2. VMware Certificate Authority 
  3. Custom Certificate Authority 
  4. Subordinate Certificate Authority
Correct answer: A
Question 3
A company provides critical financial and statistical data for several major banks.
  • The company ensures that the bank's customer data is secure and that analytics data is available when needed.
  • Customers rely on this data before making crucial business and financial decisions.
  • Just a few minutes of downtime can result in loss of revenue and trust.
  • To meet high-availability requirements, the company's IT infrastructure components must be redundant.
  • The company established three data centers across the globe and interconnected them with high-speed WAN links.
  • Due to the rapid growth of its customers and their increasing demands, the compute, network, and storage were procured and managed by the company's enterprise system administrators group.
What are its two key challenges? (Choose two.)
  1. Data centers across the globe possess manageability problems. 
  2. Availability of business applications must be ensured. 
  3. Regulatory requirements must be met. 
  4. Hardware-defined data centers have limitations.
Correct answer: CD
Question 4
A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:
  • The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.
  • The new severs have a 90-day delivery time.
  • A data center for disaster recovery has been selected, and it is 20 miles way and connected by MPLS.
  • The security team will continue to utilize its current investments and VM Encryption for the new environment.
  • The backup team currently uses Data Domain, and reports show an 8.1 compression and deduplication ratio for backups.
Based on the information obtained, which two statements are assumptions for the new design? (Choose two.)
  1. MPLS will be used to connect the two data centers. 
  2. There is 180 days left of current capacity. 
  3. Data Domain will get an 8:1 compression and deduplication ratio with the new workloads. 
  4. A disaster will NOT affect both data centers.
Correct answer: BD
Question 5
A company is consolidating its IT operations efforts by moving the Finance, IT, and QA departments towards a self-service environment, following SDDC best practices:
  • All departments have different priorities and expectations for uptime of the required infrastructure and applications.
  • Project stakeholders are still discussing final approvals for the budget wan the CFO.
  • To drive down the operating cost of the environment, only blade servers will implement this project.
  • To ensure business continuity, a colocation provider was chosen to fail over virtual machines.
  • The implementation of the project will follow a public reference architecture provided by VMware.
What is the assumption in this scenario?
  1. The chosen architecture is sufficient. 
  2. All departments demand different SLAs. 
  3. Final budget approvals are being discussed. 
  4. The environment will be shared by several departments.
Correct answer: A
Question 6
A customer has storage arrays from two different storage vendors at two different sites. The customer warts to restore operations at the secondary site in the event of a disaster. Which VMware technology must be used to meet this requirement?
  1. vSphere replication 
  2. vSphere Data Protection 
  3. array-based replication 
  4. vSphere Fault Tolerance
Correct answer: A
Question 7
A development team must provide layer 2 network isolation between virtual machines that are in the same VLAN. The solutions architect must provide additional security between the virtual machines on the same subnet. How can this be done without consuming more VLANs?
  1. Use Virtual Switch Tagging. 
  2. Use Private VLANs. 
  3. Use Virtual Guest Tagging. 
  4. Use External Switch Tagging.
Correct answer: A
Question 8
A customer is using blade servers with only one HBA. Which two design concepts apply to this scenario? (Choose two.)
  1. Assumption 
  2. Risk 
  3. Constraint 
  4. Requirement
Correct answer: BC
Question 9
A solution architect has finished conducting interviews and gathering requirements for a company, and has determined that the logical requirements are:
  • two data centers for high availability
  • synchronous replication to meet the zero minute RPO
  • separating management workloads from application workloads
  • dedicated 10Gb uplink for each low latency server
  • single management point for the entire environment
Which two actions would meet the design requirements? (Choose two.)
  1. Configure 1 Port Group with a dedicated 10Gb Uplink for low latency servers. 
  2. Deploy two clusters, one for management workloads and one for application workloads. 
  3. Build 2 Port Groups, one for management serves and one for application servers. 
  4. Install two vCenter Servers in Enhanced Link Mode.
Correct answer: AB
Question 10
An architect is designing a vSphere 6.5 implementation.
  • The customer requires Cross vCenter vMotion for the newly-created data centers in New York and Houston.
  • Each data center will use different IP networks for management and vMotion.
When creating a vMotion network, which two statements are required in order to use Cross vCenter Server vMotion? (Choose two.)
  1. vMotion Networks in both data centers must be in the same L2 stretched VLAN. 
  2. The virtual machine port groups must use the same name. 
  3. VMkernel port for vMotion must be configured with vMotion TCP/IP Stack with the correct gateway. 
  4. vMotion networks in both data centers must be routable over L3 network.
Correct answer: AC
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!