Download Lean Six Sigma White Belt.LSSWB.TestKing.2019-05-16.76q.vcex

Vendor: Six Sigma
Exam Code: LSSWB
Exam Name: Lean Six Sigma White Belt
Date: May 16, 2019
File Size: 250 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Demo Questions

Question 1
The Motorola company is credited with the origin of the Six Sigma Methodology.
  1. True
  2. False
Correct answer: A
Question 2
Which of the following is considered the father of Six Sigma? 
  1. Jack Welch
  2. Mikel Harry
  3. Richard Schroeder
  4. Bob Galvin
Correct answer: B
Question 3
Which of the following is NOT a common misconception of the Six Sigma Methodology? 
  1. Six Sigma can fix anything.
  2. Six Sigma is too expensive.
  3. Six Sigma is concerned with metrics and ignores common sense.
  4. Six Sigma aims to reduce defects in hopes of increasing profitability.
Correct answer: D
Question 4
Which of the following correctly orders the Six Sigma Certification Belt levels from lowest to highest?
  1. Green, Master Black, Yellow, White
  2. Master Black, Black, Green, Yellow, White
  3. White, Yellow, Green, Black, Master Black
  4. White, Yellow Black, Master Black, Green
Correct answer: C
Question 5
Which of the following is NOT a component of Six Sigma Yellow Belt Training?
  1. Advanced Project and Team Management Skills
  2. Data collection
  3. Basic Quality Tools
  4. Six Sigma Roles
Correct answer: A
Explanation:
Question 6
Which of the following Belt Levels usually require a Six Sigma Project be completed before a Six Sigma Certification is awarded?
  1. White Belt
  2. Yellow Belt
  3. Green Belt
  4. Black Belt
  5. Master Black Belt
  6. None of the Above
  7. All of the above
Correct answer: G
Question 7
Lean principles often go hand-in-hand with Six Sigma principles.
  1. True
  2. False
Correct answer: A
Question 8
Which of the following is NOT a similarity between Lean and Six Sigma concepts?
  1. They are both concerned with continuous improvement. 
  2. They both seek to increase instances of waste within an organization.
  3. They are both concerned with an overall culture of quality rather than single events that increase quality and decrease defects.
Correct answer: C
Question 9
Which of the following shows phases of the Rummler-Brache Method in the correct order?
  1. Definition, Implementation, Improvement Planning, Management of Process
  2. Definition, Improvement Planning, Implementation
  3. Improvement Planning, Definition, Analysis and Design, Implementation, Management of Process
  4. Definition, Improvement Planning, Analysis and Design, Implementation, Management of Process
Correct answer: C
Question 10
Scrum is used:
  1. When teams want to create new technical products
  2. when teams want to integrate new developments on existing products within a short time frame
  3. All of the above
  4. None of the above
Correct answer: C
Explanation:
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!