Question 1
A ___________ is used primarily to track the stability of the average value of a metric of interest.
  1. NP Chart
  2. Xbar-R Chart
  3. I-MR Chart
  4. C Chart
Correct answer: B
Question 2
For her injection molding project a Belt needed to track the percentage of defectives of a particular sample set so she used a ___________ to display the data?
  1. Individual Chart
  2. C Chart
  3. Xbar Chart
  4. P Chart
Correct answer: D
Question 3
Which of these graphs demonstrates conditions which would be sufficient to enable OCAP for the process?
  1. Xbar Chart
  2. Time Series Chart
  3. Neither
  4. Both
Correct answer: A
Question 4
Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?
  1. Data shift analysis
  2. Outlier analysis methods
  3. Center Line and Control Limits
  4. None of the above
Correct answer: C
Question 5
Common and ______________ Cause Variation are the focus of Statistical Process Control.
  1. Uncommon
  2. Ordinary
  3. Special
  4. Selective
Correct answer: C
Question 6
Special Cause Variation falls into which two categories?
  1. Natural & Unnatural
  2. Short Term & Long Term
  3. Assignable & Pattern
  4. Attribute & Discreet
Correct answer: C
Question 7
Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the ______________.
  1. Histograms
  2. SPC Charts
  3. NP Charts
  4. Pareto Charts
Correct answer: B
Question 8
If the production is for higher volume and monitoring and the Mean and variability is to be monitored for four machines producing product and the characteristic to be monitored is Variable Data, which SPC Chart is best to be selected?
  1. Xbar-R Chart
  2. Individual-MR Chart
  3. NP Chart
  4. CUSUM Chart
Correct answer: A
Question 9
When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity with a robust SPC system on the characteristic of interest in the defect as an early warning system.
  1. True
  2. False
Correct answer: B
Question 10
Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.
  1. Response Plan
  2. Call List
  3. Chain-of-Command
  4. Defect Analysis Plan
Correct answer: A
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!