Question 1
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
  1. It posts planning results to the database automatically.
  2. It propagates exception messages from a component to the finished product.
  3. It calculates the delay time which may occur in planning.
  4. It triggers multilevel bottom-up scheduling.
Correct answer: C
Question 2
Which of the following functions does SAP Supply Chain Management (SCM) offer?
  1. Planning and optimization of supply chains across company boundaries.
  2. Optimization of the procurement strategy with the supplier pool.
  3. Product development, safety, quality, and maintenance.
  4. Communication to customers through different interaction channels.
Correct answer: A
Question 3
What sequence do you follow in master data maintenance to define the production of a material?
  1. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
  2. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
  3. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
  4. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
Correct answer: A
Explanation:
appropriate answer.
appropriate answer.
Question 4
In what sequence are the steps of material requirements planning performed in SAP ECC?
  1. 1. Net requirements calculation2. Lot sizing3. Scheduling4. Determination of the procurement type
  2. 1. Calculation of safety stock2. Lot sizing3. Scheduling4. Determination of the procurement type
  3. 1. Net requirements calculation2. Lot sizing3. Determination of the procurement type4. Scheduling
  4. 1. Availability check2. Lot sizing3. Determination of the procurement type4. Scheduling
Correct answer: C
Question 5
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:
- Start: 7:00:00 a.m.
- End: 3:00:00 p.m.
- Break duration: 1 hour
- Rate of utilization: 80%
- Overload: 110%
- Number of individual capacities: 1
How large is the standard available capacity?
  1. 7 hours
  2. 6.16 hours
  3. 5.6 hours
  4. 8 hours
Correct answer: C
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!