Question 1
SAP Enterprise Asset Management uses technical objects. 
Which technical object represents an individual physical object that is maintained as an autonomous unit?
  1. Equipment
  2. Work center
  3. Serial number
  4. Bill of material Answer: A
Correct answer: A
Question 2
You want to create one bill of material (BOM) to be used for several equipment master records. Therefore, you create a material BOM. 
In which field do you enter the corresponding material number to assign this material BOM to the equipment master record?
  1. In the Structure Indicator field
  2. In the Construction Type field
  3. In the Order Type field
  4. In the Usage Times field Answer: B
Correct answer: A
Question 3
Which of the following objects are technical objects in SAP Enterprise Asset Management? (Choose three)
  1. Work center
  2. Equipment
  3. Reference object
  4. Functional location
  5. Bill of material Answer: B,D,E
Correct answer: A
Question 4
A non-stock item is assigned to a plant maintenance order. 
Which document is generated when the order is released or saved?
  1. A purchase requisition
  2. A purchase order
  3. A material document
  4. An inventory reservation Answer: A
Correct answer: A
Question 5
You perform a completion confirmation on an internally processed operation of a plant maintenance order. 
Which of the following functions can be performed during this step? (Choose two)
  1. Print the shop papers
  2. Release the maintenance order
  3. Enter the measurement readings
  4. Record the actual costs
  5. Settle the order Answer: C,D
Correct answer: A
Question 6
To which organizational units can a maintenance planning plant be assigned?
  1. To maintenance plants
  2. To controlling areas
  3. To functional locations
  4. To storage locations Answer: A
Correct answer: A
Question 7
In SAP Enterprise Asset Management, the first step of the corrective maintenance process is to create a notification. 
What data is collected in a notification? (Choose two)
  1. Actual repair costs
  2. Operations
  3. Tasks
  4. Activities Answer: C,D
Correct answer: A
Question 8
How do you ensure real-time integration of the accounts receivable subledger with the general ledger?
  1. Enter a reconciliation account in the billing document.
  2. Enter a reconciliation account in the customer master.
  3. Assign a reconciliation account to the revenue account.
  4. Assign postings to a profit center to derive a reconciliation account.
Correct answer: B
Question 9
Which type of business transaction integrates with Financial Accounting?
  1. A direct activity allocation
  2. A commitment
  3. A goods issue
  4. An assessment Answer: C
Correct answer: A
Question 10
Which of the following statements regarding the structure of a master record for a general ledger account is correct?
  1. The setting for the balance sheet account is defined in both the chart of accounts and company code segments.
  2. Both the chart of accounts and company code segments must be defined before you can post to the account.
  3. The company code segment is mandatory, and is defined before the chart of accounts segment.
  4. The settings for the chart of accounts segment are unique for each company code.
Correct answer: B
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!