Download Quality-Assurance.PracticeDumps.ICBB.2018-01-14.1e.206q.vcex

Download Dump

File Info

Exam IASSC Certified Lean Six Sigma Black Belt
Number ICBB
File Name Quality-Assurance.PracticeDumps.ICBB.2018-01-14.1e.206q.vcex
Size 1.4 Mb
Posted January 14, 2018
Downloaded 0



How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase
Coupon: EXAMFILESCOM

Coupon: EXAMFILESCOM
With discount: 20%





Demo Questions

Question 1
A ___________ is used primarily to track the stability of the average value of a metric of interest.

  • A: NP Chart
  • B: Xbar-R Chart
  • C: I-MR Chart
  • D: C Chart



Question 2
For her injection molding project a Belt needed to track the percentage of defectives of a particular sample set so she used a ___________ to display the data?

  • A: Individual Chart
  • B: C Chart
  • C: Xbar Chart
  • D: P Chart



Question 3
Which of these graphs demonstrates conditions which would be sufficient to enable OCAP for the process?

  • A: Xbar Chart
  • B: Time Series Chart
  • C: Neither
  • D: Both



Question 4
Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?

  • A: Data shift analysis
  • B: Outlier analysis methods
  • C: Center Line and Control Limits
  • D: None of the above



Question 5
Common and ______________ Cause Variation are the focus of Statistical Process Control.

  • A: Uncommon
  • B: Ordinary
  • C: Special
  • D: Selective



Question 6
Special Cause Variation falls into which two categories?

  • A: Natural & Unnatural
  • B: Short Term & Long Term
  • C: Assignable & Pattern
  • D: Attribute & Discreet



Question 7
Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the ______________.

  • A: Histograms
  • B: SPC Charts
  • C: NP Charts
  • D: Pareto Charts



Question 8
If the production is for higher volume and monitoring and the Mean and variability is to be monitored for four machines producing product and the characteristic to be monitored is Variable Data, which SPC Chart is best to be selected?

  • A: Xbar-R Chart
  • B: Individual-MR Chart
  • C: NP Chart
  • D: CUSUM Chart



Question 9
When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity with a robust SPC system on the characteristic of interest in the defect as an early warning system.

  • A: True
  • B: False



Question 10
Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.

  • A: Response Plan
  • B: Call List
  • C: Chain-of-Command
  • D: Defect Analysis Plan









CONNECT US


ProfExam
PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount..

Get Now!


HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen



HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset