Question 1
In a manufacturing cloud implementation, production operators want to perform work order updates using Dispatch List. 
Identify two tasks that the Dispatch List allows the production users to perform.
  1. Report Component Returns
  2. Report Resource Transactions
  3. Report Receipts
  4. Report Material Transactions by Quantity and Serial Number
  5. Report Cost Transactions
Correct answer: BD
Explanation:
Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2013521
Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2013521
Question 2
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception and who gets notified after an exception is raised?
  1. The Production Operator can report and exception and the application generates a notification that is sent to all users who have access to the manufacturing plant.
  2. The Production Operator can report an exception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant.
  3. The Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification.
  4. The Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated notification.
Correct answer: B
Explanation:
Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092338.htm#FAUMF2273578
Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092338.htm#FAUMF2273578
Question 3
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box. 
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.
  1. Oracle Business Intelligence Standard Edition
  2. Oracle Business Intelligence Publisher
  3. Oracle Business Intelligence Enterprise Edition
  4. Oracle Business Intelligence Application
Correct answer: B
Question 4
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day. 
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.
  1. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
  2. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column.
  3. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
  4. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.
Correct answer: D
Explanation:
Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092337.htm#FAUMF2014030
Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092337.htm#FAUMF2014030
Question 5
A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours. The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon. 
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
  1. 8:00 PM
  2. 12:30 PM
  3. 2:00 PM
  4. 4:00 PM
  5. 1:00 PM
Correct answer: D
Question 6
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required. 
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario. 
Identify the reason.
  1. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
  2. Costs for purchase components P1 and P2 are not defined in cost accounting.
  3. Create Accounting was not initiated.
  4. Create Accounting Distributions was not initiated.
Correct answer: D
Question 7
A Production operator in your company is required to report production activities, such as completing or scrapping production units, by referencing a work definition without creating work orders. 
Identify the manufacturing transaction that a production operator can perform for reporting such activities.
  1. Orderless Transactions
  2. Operation Transactions
  3. Resource Transactions
  4. Movement request
  5. Material Transactions
Correct answer: A
Explanation:
Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2013702
Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2013702
Question 8
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.
  1. There are no components attached to it.
  2. The Automatically Transact check box is deselected.
  3. The Automatically Transact check box is selected.
  4. The Count Point check is selected.
  5. The Count Point check box is deselected.
Correct answer: BE
Explanation:
Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092335.htm#FAUMF2092335 (see note)
Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092335.htm#FAUMF2092335 (see note)
Question 9
The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day and Night Shift.
Identify the correct sequence of steps to achieve this requirement.
  1. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  2. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column
  3. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.
  4. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
Correct answer: C
Question 10
An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order. 
Identify two options that can cause this situation.
  1. Sourcing rules for the product item are defined as Make as well as Transfer.
  2. Sourcing rule for the product item is defined as Make, but Work Definition is not defined.
  3. Sourcing rules for the product item are defined as Buy as well as Transfer.
  4. Sourcing rule for the product item is defined as Buy.
Correct answer: AB
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!