Download ISTQB Certified Tester Foundation Level (CTFL_UK) Exam.CTFL_UK.TestKing.2018-11-02.33q.vcex

Vendor: iSQI
Exam Code: CTFL_UK
Exam Name: ISTQB Certified Tester Foundation Level (CTFL_UK) Exam
Date: Nov 02, 2018
File Size: 55 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Demo Questions

Question 1
Scenario 1 "Medical Domain" 
You are working as a test manager in the medical domain leading a team of system testers. You are currently working on a major release of the product which gives customers many new features and resolves a number of problem reports from previous releases. 
Since the system is in the medical domain and therefore in the safety critical area, testing needs to be rigorous and evidence is required that the system has been adequately tested. Identify THREE measures that would typically be part of the test approach in this domain and which are not always applicable in other domains!  
  1. High level of documentation
  2. Failure Mode and Effect Analysis (FMEA) sessions
  3. Traceability to requirements
  4. Non-functional testing
  5. Master test planning
  6. Test design techniques
  7. Reviews
Correct answer: ABC
Question 2
Scenario 1 "Medical Domain" 
You are working as a test manager in the medical domain leading a team of system testers. You are currently working on a major release of the product which gives customers many new features and resolves a number of problem reports from previous releases. 
A test log is one of the documents that need to be produced in this domain in order to provide evidence of testing. However, the level of detail of test logs can vary. 
Which of the following is NOT an influencing factor for the level of detail of the test logs being produced?
  1. Level of test execution automation
  2. Test level
  3. Regulatory requirements
  4. Experience level of testers
Correct answer: D
Question 3
Topic 2, Scenario 2 "Reviews"
A software development organization wants to introduce some specific improvements to its test process. Currently, most of their testing resources are focussedon system testing. They are developing embedded software, and do not have a simulation environment to enable them to execute software modules on the development host. They have been advised that introducing inspections and reviews could be the most appropriate step forward.
Identify the THREE types of formal peer reviews that can be recognized.
  1. Inspection
  2. Management review
  3. Walkthrough
  4. Audit
  5. Technical review
  6. Informal review
  7. Assessment
Correct answer: ACE
Question 4
Topic 2, Scenario 2 "Reviews"
A software development organization wants to introduce some specific improvements to its test process. Currently, most of their testing resources are focussedon system testing. They are developing embedded software, and do not have a simulation environment to enable them to execute software modules on the development host. They have been advised that introducing inspections and reviews could be the most appropriate step forward.
As part of the improvement program, the organization is also looking at tool support. Which type of tool could be used to ensure higher quality of the code to be reviewed?
  1. Review tool
  2. Test execution tool
  3. Static analysis tool
  4. Test design tool
Correct answer: C
Question 5
Topic 2, Scenario 2 "Reviews"
A software development organization wants to introduce some specific improvements to its test process. Currently, most of their testing resources are focussedon system testing. They are developing embedded software, and do not have a simulation environment to enable them to execute software modules on the development host. They have been advised that introducing inspections and reviews could be the most appropriate step forward.
IEEE 1028 also defines “management review” as a type of review. What is the main purpose of a management review?
  1. Align technical concepts during the design phase
  2. Establish a common understanding of requirements
  3. Provide independent evaluation of compliance to processes, regulations, standards etc.
  4. To monitor progress, assess the status of a project, and make decisions about future actions
Correct answer: D
Question 6
Topic 2, Scenario 2 "Reviews"
A software development organization wants to introduce some specific improvements to its test process. Currently, most of their testing resources are focussedon system testing. They are developing embedded software, and do not have a simulation environment to enable them to execute software modules on the development host. They have been advised that introducing inspections and reviews could be the most appropriate step forward.
Which of the following is an example of testing as part of the requirements specification phase?
  1. A requirements review meeting
  2. A business analyst eliciting requirements
  3. Performing acceptance tests against requirements
  4. A test report showing requirements coverage
Correct answer: A
Question 7
Topic 3, Scenario 3 "Tool Selection and Implementation"
Your company is considering whether or not to purchase a test tool suite from a respectable vendor. Your manager has searched the internet for comparable products but none of them meets his specific requirements. A tool demonstration has been arranged for next week and your team has been invited to attend. The tool suite consists of a test management tool, test execution tool and a requirements management tool. There is the possibility of adding a performance testing tool at a later stage. You have decided to attend the demo but raise some issues beforehand regarding expectations.
Select THREE issues from the options provided that should at least be raised.
  1. Has there been sufficient comparison of tools?
  2. What are the problems we are trying to address?
  3. Do we have a set of tool requirements to validate the tool against?
  4. How will the implementation be organized?
  5. Which project will be selected to perform the tool pilot?
  6. Is customized training available?
  7. How will the change process be managed?
Correct answer: ABC
Explanation:
Question 8
Topic 3, Scenario 3 "Tool Selection and Implementation"
Your company is considering whether or not to purchase a test tool suite from a respectable vendor. Your manager has searched the internet for comparable products but none of them meets his specific requirements. A tool demonstration has been arranged for next week and your team has been invited to attend. The tool suite consists of a test management tool, test execution tool and a requirements management tool. There is the possibility of adding a performance testing tool at a later stage. You have decided to attend the demo but raise some issues beforehand regarding expectations.
Which of the following would you least expect to form part of the analysis of initial tool costs?
  1. Integration with other tools
  2. Learning time required to use the new tool
  3. Tool portability
  4. Evaluation of suitable tools
Correct answer: C
Question 9
Topic 4, Scenario 4, V1 "Test Management Tool"
A software development company that sells an established capture-replay tool has decided to complement it with a test management tool. The capture-replay tool was developed over a number of years and is used by a large number of clients.
The test management tool will be developed by the same team that developed the capture-replay tool, using the same technology. The company test strategy mandates that structural testing is focussed at the component test level and dynamic non-functional testing is focussed at the acceptance test level.
In response to growing customer demand, it is proposed to develop the test management tool in an incremental manner. Each increment will be developed using the V life cycle model. The target platform is a PC in a local area network. The PC uses a proprietary relational database and communicates with a single PC which acts as a server.
The test management tool must interface with the company s capture replay tool. Over the first 12 months of the development period the following functionality will be developed for the tool (in two increments): basic requirements management, support for test case creation; support for test procedures, test scripts and test suites. The functionality to be included in later increments will be driven by customer demand: however they expect to provide an incident management system, a web front-end, and interfaces to other proprietary tools and database management systems.
Which of the following are valid reasons for adopting a different life cycle (from the V model), for increments after the first year?
  1. (i) and (ii)
  2. (i) and (iv)
  3. (ii) and (iii)
  4. (ii) and (iv)
Correct answer: A
Question 10
Topic 4, Scenario 4, V1 "Test Management Tool"
A software development company that sells an established capture-replay tool has decided to complement it with a test management tool. The capture-replay tool was developed over a number of years and is used by a large number of clients.
The test management tool will be developed by the same team that developed the capture-replay tool, using the same technology. The company test strategy mandates that structural testing is focussed at the component test level and dynamic non-functional testing is focussed at the acceptance test level.
In response to growing customer demand, it is proposed to develop the test management tool in an incremental manner. Each increment will be developed using the V life cycle model. The target platform is a PC in a local area network. The PC uses a proprietary relational database and communicates with a single PC which acts as a server.
The test management tool must interface with the company s capture replay tool. Over the first 12 months of the development period the following functionality will be developed for the tool (in two increments): basic requirements management, support for test case creation; support for test procedures, test scripts and test suites. The functionality to be included in later increments will be driven by customer demand: however they expect to provide an incident management system, a web front-end, and interfaces to other proprietary tools and database management systems.
Which of the following is a characteristic of good testing in any life cycle model?
  1. Analysis and design of tests begins as soon as development is completed.
  2. Some, but not all, development activities have corresponding test activities.
  3. Each test level has test objectives specific to that level.
  4. All document reviews involve the development team.
Correct answer: C
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!