Download Blueworks Live IBM Business Process Manager Express or Standard Edition, V8.0 BPM Analysis.C9550-275.NewDumps.2019-03-06.49q.vcex

Vendor: IBM
Exam Code: C9550-275
Exam Name: Blueworks Live IBM Business Process Manager Express or Standard Edition, V8.0 BPM Analysis
Date: Mar 06, 2019
File Size: 5 MB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Demo Questions

Question 1
A BPM analyst is working with a facilities manager to map out a process that lists the responsibilities of the facilities manager. 
In the event of a damage to a building, the facilities manager must take the following actions:
  • If the damage is caused by fire, the facilities manager must immediately call the fire service. 
  • If there is anyone injured, the facilities manager must immediately call the nearby hospital ambulance service. 
  • If the damage is greater than $5000, the facilities manager must notify the insurance agent immediately. 
  • The facilities manager must always submit a damage report to the building manager within 1 week of the incident. 
How should the BPM analyst model this process?
  1.   
  2.   
  3.   
  4.   
Correct answer: C
Question 2
A BPM analyst has modeled the process for creating a custom coffee beverage. The BPM analyst noticed a lot of detail in the process model and has started refactoring the model to reduce the complexity. 
Which section of the process represents a series of activities performed by the same participant that the analyst reduced into a single activity?
  1.   
      
  2.   
  3.   
      
  4.   
      
Correct answer: B
Question 3
A BPM analyst needs to make a change to the connections in the following process diagram. The order of activities needs to be changed so that “Grind Beans” is followed by “Brew Coffee”. “Heat Milk” will come last after “Brew Coffee”. 
  
How should the BPM analyst make this change to the connection?
  1. Click on the “Brew Coffee” activity and drag it onto the connection between “Grind Beans” and “Heat Milk”
  2. Click on the “Grind beans” activity and drag it onto the connection between “Heat Milk” and “Brew Coffee”
  3. Click on the connection between “heat Milk” and “Brew Coffee” and drag the connection arrow to “Grind Beans”
  4. Click on the connection between “grind Beans” and “Heat Milk” and drag the connection arrow to “Brew Coffee”
Correct answer: A
Question 4
A BPM analyst is mapping a Mortgage Loan Approval Process. When the applicant requests a loan, the Loan officer must start the credit check, employment check at the same time. 
How should the BPM analyst map this process?
  1.   
  2.   
  3.   
  4.   
Correct answer: B
Question 5
The BPM analyst is mapping a Recruiting process for a company where the Hiring manager submits a Hiring request and the HR Director makes the decision to approve or reject the request. If approved, the HR Admin will post the position on a job search website. If rejected, the HR Director will notify the Hiring manager.  
How should the BPM analyst map this process?
  1.   
  2.   
  3.   
  4.   
Correct answer: A
Question 6
A BPM analyst is defining a mortgage loan approval process where the Business Process Management System (BPMS) will get the credit score of the applicant from the Credit Bureau and validate if the loan can be approved for the applicant. 
The BPM analyst must add this activity:
  1. as an Ad-Hoc Event.
  2. to a System Lane.
  3. to both a Human Participant and System Lane.
  4. to a Human Participant Lane who had the prior task.
Correct answer: B
Question 7
A BPM analyst is creating a process model for requesting a renovation permit. the BPM analyst is using the following description of the first activity:
“One of our municipal office clerks receives a paper permit application from the local resident, an applicant. the clerk first looks up the resident’s name and address on our system, then enters the information from the paper application onto the system, and assigns a temporary permit number to the application. When the application entry is complete, the clerk sends it to a manager to assign it to an adjudicator.” 
Which name should the BPM analyst use for the first task that accurately describes the activity and follows recommended naming conventions?
  1. Application Entry
  2. Create Application
  3. Clerk Receive and Enter Application
  4. Lookup name, create application, assign number, and send it to the manager
Correct answer: B
Question 8
A BPM analyst is discovering a process where the subject matter experts are explaining what to do when process instances fail during system maintenance. 
Which symbol in the BlueWorks Live should the BPM analyst use to define this process?
  1.   
  2.   
  3.   
  4.   
Correct answer: B
Question 9
A BPM analyst is modeling the process for acquiring membership at a club. The BPN analyst interviewed the front office supervisor, who provided the following description of the first activity “Enter Application”:
“One of our receptionists receives a paper application from a potential client, an applicant. the receptionist first looks up the client’s name and address to see if it exists in our system, then enters the information from the paper application into the system, and assigns a membership number to the application. When the application entry is complete, the receptionist sends it to the manager for an initial review.” 
The BPM analyst has created the discovery map and now needs to enter information from the above description into the Details fields in Blueworks Live for the activity “Enter Application”. 
For the activity “Enter Application”, who is the Supplier?
  1. Manager
  2. Applicant
  3. Receptionist
  4. Front Office Supervisor
Correct answer: B
Question 10
On a project, the BPM analyst defined the following to identify the Key Performance Indicator (KPI):
  • The goal of the project was to improve the efficiency of the process. 
  • The concern was that the process was not fast enough. 
  • The Critical to Quality (CTQ) was the speed of the process. 
  • The client was interested in the cycle time of the process. 
  • The time stamps at the beginning and at the end of the process are captured. 
Which step did the BPM analyst fail to perform in identifying the KPI?
  1. Know the client objectives
  2. Know how to define the client’s KPI
  3. Know the process decision makers
  4. Know the client’s Service Level Agreements (SLAs)
Correct answer: C
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!