Demo Questions

Question 1
A customer plans to implement a web-based solution that requires 34 Power cores. They want to acquire a POWER8 solution with the best TCA. 
Assuming all other configuration requirements are equal, which solution provides the best TCA?
  1. Two S824s
  2. One E870
  3. One S822
  4. Three S814s
Correct answer: C
Explanation:
Reference: https://www-01.ibm.com/events/wwe/grp/grp030.nsf/vLookupPDFs/POWER8%20as%20a%20Platform%20of%20Choice%20for%20CAMS_Alessio_FINAL/$file/POWER8%20as%20a%20Platform%20of%20Choice%20for%20CAMS_Alessio_FINAL.pdf (page 9)
Reference: https://www-01.ibm.com/events/wwe/grp/grp030.nsf/vLookupPDFs/POWER8%20as%20a%20Platform%20of%20Choice%20for%20CAMS_Alessio_FINAL/$file/POWER8%20as%20a%20Platform%20of%20Choice%20for%20CAMS_Alessio_FINAL.pdf (page 9)
Question 2
What elements of POWER8 technology can be exploited by software developers to optimize performance on an E870?
  1. First Failure Data Capture (FFDC) and Service processor
  2. Hypervisor and Thermal Power Management Device (TPMD)
  3. Transactional memory and SMT
  4. Active Memory Expansion and storage keys
Correct answer: D
Question 3
Which of the following is required to run IBM Cloud PowerVC Manager?
  1. AIX
  2. VIOS
  3. Linux
  4. IBM i
Correct answer: C
Explanation:
Reference: http://www.ibm.com/support/knowledgecenter/SSVSPA_1.3.1/com.ibm.powervc.cloud.help.doc/powervc_cloud_installing_download.html
Reference: http://www.ibm.com/support/knowledgecenter/SSVSPA_1.3.1/com.ibm.powervc.cloud.help.doc/powervc_cloud_installing_download.html
Question 4
A customer needs to update their Linux application and is comparing Power to x86 solutions. 
What benefit can be highlighted to demonstrate the value that POWER8 offers compared to x86 solutions?
  1. POWER8 offers faster processor speeds.
  2. POWER8 offers more sockets and cores per server.
  3. PowerVM is more secure than VMware.
  4. POWER8 offers four times the number of threads per core than x86.
Correct answer: D
Question 5
Which of the following RAS features is available on POWER8 Scale-out servers?
  1. Redundant System Clocks
  2. Dynamic Processor Deallocation
  3. Capacity on Demand
  4. Redundant System Processors
Correct answer: A
Question 6
IBM is competing with Cisco for a large Oracle database opportunity. 
What advantage of POWER8 systems should an IBM Power reseller emphasize?
  1. They run Linux.
  2. They can be virtualized.
  3. They are managed by a single pane of glass.
  4. They offer greater scalability.
Correct answer: D
Question 7
An existing customer wants to minimize the risk of replacing their HP system running an Oracle database with IBM Power Systems. 
Which resource should be reviewed with the customer?
  1. IBM Power System’s ranking on the RPE website
  2. IBM Power Systems Roadmap
  3. IBM’s participation in the OpenPOWER Foundation
  4. IBM Migration Factory
Correct answer: D
Question 8
A customer is implementing a new mission critical SAP landscape and requires a Power system with the highest level of RAS support. 
Which of the following will satisfy the requirement?
  1. E880 only
  2. Any POWER8 system
  3. S824, E870, or E880
  4. E870 or E880
Correct answer: D
Question 9
A customer wants to make use of a public cloud solution for applications that run on Linux on Power. 
Which of the following can accommodate the customer requirement?
  1. Amazon Web Services
  2. SoftLayer
  3. Microsoft Azure
  4. Oracle Cloud
Correct answer: B
Explanation:
Reference: http://www-03.ibm.com/systems/power/solutions/cloud/
Reference: http://www-03.ibm.com/systems/power/solutions/cloud/
Question 10
A customer acquired a local rival year that had two existing POWER6 570s: each with 16-cores running in an active/active cluster with IBM i and PowerHA. They are ready to refresh the solution using an active/passive cluster with a minimum of 26 cores for their production partition. The customer has a limited budget.
For the least cost, which option should the Power Seller propose?
  1. Two E870s with one classified as a CBU and transfer the PowerHA licenses.
  2. Two S824s with one classified as a CBU and transfer the PowerHA licenses.
  3. Two E870s with one classified as a CBU and PowerHA.
  4. Two E850s with one classified as a CBU and transfer the PowerHA licenses.
Correct answer: B
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!