Download IBM Power Systems with POWER8 Sales Skills V2.C9010-260.Pass4Sure.2018-10-11.71q.vcex

Vendor: IBM
Exam Code: C9010-260
Exam Name: IBM Power Systems with POWER8 Sales Skills V2
Date: Oct 11, 2018
File Size: 41 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Demo Questions

Question 1
A credit card company is going to implement a new application for which security is a major requirement. The company has been quoted a solution running in Windows. 
Why should the company consider a Power Systems solution? 
  1. IBM AIX and IBM i have security check points that make it nearly impossible to be hacked.
  2. Starting with POWER8, security is built into the processor.
  3. PowerSC includes templates for PCI compliance.
  4. IBM has superior firewalls.
Correct answer: C
Explanation:
Reference: https://www.ibm.com/developerworks/community/wikis/home/wiki/Power%20Systems/page/PowerSC%20POWER%20Security%20and%20Compliance%20Toolset?lang=en
Reference: https://www.ibm.com/developerworks/community/wikis/home/wiki/Power%20Systems/page/PowerSC%20POWER%20Security%20and%20Compliance%20Toolset?lang=en
Question 2
A customer is migrating from a POWER6 570 to a POWER8 S824. 
Which technology will have to be replaced?
  1. FCoE
  2. SAS
  3. SCSI
  4. Fibre Channel
Correct answer: B
Question 3
Which systems can be members of the same Power Enterprise Pool?
  1. E850 and 750
  2. E870 and E880
  3. S822 and S824
  4. E880 and 795
Correct answer: D
Explanation:
Reference: http://www.ibm.com/support/knowledgecenter/POWER8/p8ha2/systempool_cod.htm
Reference: http://www.ibm.com/support/knowledgecenter/POWER8/p8ha2/systempool_cod.htm
Question 4
A customer running Linux with KVM on their x86 systems wants to add an S822L into the environment using a consistent virtualization technology. 
How can a Power option satisfy the requirement?
  1. Implement PowerKVM on the Power System.
  2. Convert KVM to PowerVM on the x86 systems for consistency with the Power Systems.
  3. Implement PowerVM and KVM since the functionality and management interface are shared.
  4. Implement Kimchi as the management interface to support both environments.
Correct answer: C
Question 5
An existing IBM Power Systems customer has POWER7 servers and an older HMC. They want to add an E870. 
What is the minimum HMC hardware version they must be running for the latest HMC code to support their new server?
  1. 7042-CR9
  2. 7042-CR5
  3. 7042-CR8
  4. 7042-CR4
Correct answer: A
Explanation:
Reference: https://www-304.ibm.com/webapp/set2/sas/f/power5cm/supportedcodeHMCHW.html
Reference: https://www-304.ibm.com/webapp/set2/sas/f/power5cm/supportedcodeHMCHW.html
Question 6
A customer is concerned about Power Systems security in a virtualized environment. They want real-time monitoring and trusted firewall between LPARs. 
Which IBM product should be proposed?
  1. IBM Security Access Manager for Enterprise Single Sign-On
  2. PowerSC
  3. Tivoli Security Policy Manager
  4. PowerVM
Correct answer: B
Explanation:
Reference: http://www.ibmsystemsmag.com/aix/administrator/security/powersc_aix/
Reference: http://www.ibmsystemsmag.com/aix/administrator/security/powersc_aix/
Question 7
A customer has a BladeCenter S (BCS) with a POWER6 blade. They want to upgrade to POWER8 with 8 cores, 12 internal drives with room for growth, and an external LTO tape drive. 
Which of the following is the lowest recommendation to satisfy their requirement?
  1. S814
  2. POWER8 blade in the current BCS 
  3. S822
  4. S824
Correct answer: A
Explanation:
Reference: https://www.redbooks.ibm.com/redpapers/pdfs/redp5097.pdf
Reference: https://www.redbooks.ibm.com/redpapers/pdfs/redp5097.pdf
Question 8
A customer wants to know how CAPI can benefit their operations. 
What is a CAPI benefit?
  1. Ability for a shared memory space between an application and an FPGA accelerator.
  2. Ability for faster access to system memory from the POWER8 processor.
  3. Ability for POWER8 LPARs to suspend/resume.
  4. Ability to accelerate all database solutions.
Correct answer: A
Explanation:
Reference: https://www-304.ibm.com/webapp/set2/sas/f/capi/capidetails.html
Reference: https://www-304.ibm.com/webapp/set2/sas/f/capi/capidetails.html
Question 9
A customer will order a POWER8 hardware solution that was proposed. 
Which of the following should be used to create and submit the appropriate hardware solution to IBM manufacturing?
  1. e-config
  2. System planning tool
  3. IBM Lab Services
  4. HMCscanner
Correct answer: A
Question 10
A customer wants to simplify virtualization management and specifically wants the ability to capture and deploy images of the virtual environment. 
In addition to PowerVM, which software product will satisfy the requirement?
  1. PowerHA System Mirror
  2. IBM Cloud PowerVC Manager
  3. PowerVP
  4. PowerKVM
Correct answer: B
Explanation:
Reference: http://www-03.ibm.com/systems/power/software/virtualization-management/
Reference: http://www-03.ibm.com/systems/power/software/virtualization-management/
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!