Download Power Systems Scale-Up Technical Sales.C1000-031.TestKing.2019-03-05.42q.vcex

Vendor: IBM
Exam Code: C1000-031
Exam Name: Power Systems Scale-Up Technical Sales
Date: Mar 05, 2019
File Size: 26 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Demo Questions

Question 1
Which of the following is a benefit of the POWER9 processor with Power Enterprise Servers when compared to x86?
  1. DDR4 Memory
  2. More cores per socket
  3. More threads per core
  4. NVIDIA Tesla V100
Correct answer: B
Explanation:
Reference: https://www.ibm.com/it-infrastructure/power/power9
Reference: https://www.ibm.com/it-infrastructure/power/power9
Question 2
An IBM Business Partner is designing a solution with two POWER9 processor-based servers, an IBM V7000 storage, and IBM SAN switches. 
Which of the following will allow them to check the compatibility of software, device drivers, multipathing, and other technical specifications?
  1. IBM Facts and Features
  2. IBM System Storage Interoperation Center (SSIC)
  3. e-config
  4. Support web sites of the potential Original Equipment Manufacturers (OEM)
Correct answer: B
Question 3
Due to an emergency situation, a customer needs to activate all processor and memory resources in a Power System E980 for ten days. 
Which of the following could be used to achieve this need with the least possible cost?
  1. Elastic CoD
  2. Trial CoD
  3. Utility CoD
  4. Static Activation
Correct answer: A
Explanation:
Reference: https://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/6/877/ENUSZG18-0086/index.html&request_locale=en
Reference: https://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/6/877/ENUSZG18-0086/index.html&request_locale=en
Question 4
A customer requires that each client partition have access to two different VLANs. VLAN tagging will NOT be used in the environment. 
  • There will be four client partitions, each of which will be connected to VLAN1 and VLAN2. 
  • There will be two VIOS. 
  • Redundant Ethernet connections will be accomplished using the Shared Ethernet Adapter (SEA) and dual VIOS. 
What is the minimum number of Ethernet ports that will be required in each VIOS?
  1. 8
  2. 4
  3. 6
  4. 2
Correct answer: B
Explanation:
Reference: https://www.ibm.com/developerworks/aix/tutorials/au-sea-config/index.html
Reference: https://www.ibm.com/developerworks/aix/tutorials/au-sea-config/index.html
Question 5
While migrating from a Power System E880 to a Power System E980, which of the following is automatically provided on both systems?
  1. PowerVM Standard Edition
  2. IBM Cloud PowerVC Manager
  3. PowerVM Enterprise Edition
  4. IBM Cloud Private
Correct answer: B
Question 6
A customer is considering a purchase of a Power System E950. One PCIe Gen3 I/O expansion drawer is required to meet the I/O adapter requirements. 
How many racks units (EIA) are required?
  1. 8
  2. 9
  3. 6
  4. 10
Correct answer: C
Explanation:
Reference: http://www.redbooks.ibm.com/redpapers/pdfs/redp5509.pdf
Reference: http://www.redbooks.ibm.com/redpapers/pdfs/redp5509.pdf
Question 7
A customer is comparing a Power Systems solution with an x86 solution for big data analytics. 
Which no-charge IBM analysis is available to justify the value of IBM Power Servers compared to x86 solutions?
  1. IT Economics Study (Eagle Study)
  2. Performance Navigator
  3. System Planning Tool
  4. Workload Estimator
Correct answer: D
Explanation:
The IBM Systems Workload Estimator is a web-based sizing tool for IBM Power Systems, System i, System p, System x, IBM Flex Systems, and IBM PureFlex Systems. You can use this tool to size a new system, to size an upgrade to an existing system, or to size a consolidation of several systems. The Workload Estimator (WLE) allows measurement input to best reflect your current workload and provides a variety of built-in workloads to reflect your emerging application requirements. Virtualization can be used to yield a more robust solution. The Workload Estimator will provide current and growth recommendations for processor, memory, and disk that satisfy the overall client performance requirements Reference: https://www.ibm.com/developerworks/community/blogs/systemssupport/entry/ibm_systems_workload_estimator_and_energy_estimator2?lang=en
The IBM Systems Workload Estimator is a web-based sizing tool for IBM Power Systems, System i, System p, System x, IBM Flex Systems, and IBM PureFlex Systems. You can use this tool to size a new system, to size an upgrade to an existing system, or to size a consolidation of several systems. The Workload Estimator (WLE) allows measurement input to best reflect your current workload and provides a variety of built-in workloads to reflect your emerging application requirements. Virtualization can be used to yield a more robust solution. The Workload Estimator will provide current and growth recommendations for processor, memory, and disk that satisfy the overall client performance requirements 
Reference: https://www.ibm.com/developerworks/community/blogs/systemssupport/entry/ibm_systems_workload_estimator_and_energy_estimator2?lang=en
Question 8
Which of the following statements is true regarding Dynamic Logical Partitioning (DLPAR)?
  1. In a disaster, it will immediately move active LPARs from a local system to a remote system, over the network with only a pause in service.
  2. In a disaster, it will immediately move active LPARs from a local system to another local system, using a common SAN, with only a pause in service.
  3. It enables the relocation of resources such as CPU and memory between LPARs as required, without an interruption in service.
  4. It will automatically allocate an unlicensed processor to an LPAR to replace one that has reached the threshold for errors.
Correct answer: D
Explanation:
Reference: http://ibmsystemsmag.com/aix/administrator/lpar/dynamic-lpar---the-way-to-the-future/?page=2
Reference: http://ibmsystemsmag.com/aix/administrator/lpar/dynamic-lpar---the-way-to-the-future/?page=2
Question 9
An AIX customer is purchasing two new POWER9 processor-based servers: each connected to its own DS8880 at different sites. The customer wants high availability with the least amount of downtime.
Which solution will satisfy the customer’s requirements?
  1. Combine PowerHA with DS8880 data replication capabilities for automated failover across the sites.
  2. Create dual VIOS on each POWER9 and double the total number of adapters in each machine.
  3. Use the DS8880 data replication capabilities to replicate the data across the sites. 
    Configure PowerVM Live Partition Mobility for application availability.
  4. Use the DS8880 data replication capabilities to perform automated node failover across the sites.
Correct answer: B
Question 10
A customer has ordered a Power System E980. The system has been built, but cannot be shipped. 
What would prevent the system from being shipped?
  1. The mandatory pre-install TDA has not been completed.
  2. The IBM System Support representative has not completed the pre-install site visit.
  3. The opportunity owner has not released it.
  4. A pre-sale TDA discovered correctable issues that have not been corrected.
Correct answer: D
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!