Question 1
A customer requires that each client partition have access to two different VLANs. VLAN tagging will NOT be used in the environment. 
  • There will be four client partitions, each of which will be connected to VLAN1 and VLAN2. 
  • There will be two VIOS. 
  • Redundant Ethernet connections will be accomplished using the Shared Ethernet Adapter (SEA) and dual VIOS. 
What is the minimum number of Ethernet ports that will be required in each VIOS? 
  1. 8
  2. 4
  3. 6
  4. 2
Correct answer: B
Explanation:
Reference: https://www.ibm.com/developerworks/aix/tutorials/au-sea-config/index.html
Reference: https://www.ibm.com/developerworks/aix/tutorials/au-sea-config/index.html
Question 2
A customer has four AIX VMs, each running a different application that needs simultaneous read/write access to the same files. 
Which of the following products should be recommended?
  1. Power HA Enterprise Edition
  2. Spectrum Scale
  3. Spectrum Protect
  4. Power HA Standard Edition
Correct answer: A
Question 3
A customer with an AIX in-house SMT2 application on POWER6 would like to upgrade to POWER9. The customer would like to know the relative performance of the servers. 
Which resource provides the SMT2 performance of the two systems?
  1. IBM Performance Management for Power Systems
  2. IBM Power Systems Performance Report
  3. IBM Power Systems Facts and Features
  4. IBM Systems Workload Estimator
Correct answer: A
Question 4
While migrating from a Power System E880 to a Power System E980, which of the following is automatically provided on both systems?
  1. PowerVM Standard Edition
  2. IBM Cloud PowerVC Manager
  3. PowerVM Enterprise Edition
  4. IBM Cloud Private
Correct answer: B
Explanation:
Question 5
Which of the following is an advantage of Power System Servers over Oracle Exadata solutions?
  1. Support for Flash Drives
  2. Ability to add cores and memory
  3. Can run Oracle 12C natively
  4. Offers a greater quantity of cores for enhanced scaling
Correct answer: B
Explanation:
Reference: https://www.slideshare.net/miguelnoronha/why-oracle-on-ibm-power7-is-better-than-oracle-exadata-the-advantages-of-ibm-power7-systems (slide 10)
Reference: https://www.slideshare.net/miguelnoronha/why-oracle-on-ibm-power7-is-better-than-oracle-exadata-the-advantages-of-ibm-power7-systems (slide 10)
Question 6
Which IBM Power Systems Software provides network firewall services with the local virtualized server to control network traffic between LPARs? 
  1. PowerSC
  2. Trusted AIX
  3. PowerVC
  4. Trusted Surveyor
Correct answer: A
Explanation:
Reference: http://www.common.be/system/files/files/Power_Systems_2013_PC.pdf (20)
Reference: http://www.common.be/system/files/files/Power_Systems_2013_PC.pdf (20)
Question 7
A customer has several workloads using LPARs. The customer desires that the maximum number of active cores be made available for each workload, a shared SAN connection, and dedicated LAN throughput for each workload. 
Which of the following satisfies the workload requirements?
  1. Dedicated donating cores, NPIV, SR-IOV network
  2. Shared Processor Pool, vSCSI, VIOS SEA
  3. Shared Processor Pool, Dedicated HBAs, dedicated LAN adapters
  4. Shared Processor Pool, NPIV, dedicated LAN adapters
Correct answer: D
Question 8
A customer is considering a purchase of a Power System E950. One PCIe Gen3 I/O expansion drawer is required to meet the I/O adapter requirements. 
How many racks units (EIA) are required?
  1. 8
  2. 9
  3. 6
  4. 10
Correct answer: C
Explanation:
Reference: http://www.redbooks.ibm.com/redpapers/pdfs/redp5509.pdf
Reference: http://www.redbooks.ibm.com/redpapers/pdfs/redp5509.pdf
Question 9
A customer is comparing a Power Systems solution with an x86 solution for big data analytics. 
Which no-charge IBM analysis is available to justify the value of IBM Power Servers compared to x86 solutions?
  1. IT Economics Study (Eagle Study)
  2. Performance Navigator 
  3. System Planning Tool
  4. Workload Estimator
Correct answer: D
Explanation:
The IBM Systems Workload Estimator is a web-based sizing tool for IBM Power Systems, System i, System p, System x, IBM Flex Systems, and IBM PureFlex Systems. You can use this tool to size a new system, to size an upgrade to an existing system, or to size a consolidation of several systems. The Workload Estimator (WLE) allows measurement input to best reflect your current workload and provides a variety of built-in workloads to reflect your emerging application requirements. Virtualization can be used to yield a more robust solution. The Workload Estimator will provide current and growth recommendations for processor, memory, and disk that satisfy the overall client performance requirements Reference: https://www.ibm.com/developerworks/community/blogs/systemssupport/entry/ibm_systems_workload_estimator_and_energy_estimator2?lang=en
The IBM Systems Workload Estimator is a web-based sizing tool for IBM Power Systems, System i, System p, System x, IBM Flex Systems, and IBM PureFlex Systems. You can use this tool to size a new system, to size an upgrade to an existing system, or to size a consolidation of several systems. The Workload Estimator (WLE) allows measurement input to best reflect your current workload and provides a variety of built-in workloads to reflect your emerging application requirements. Virtualization can be used to yield a more robust solution. The Workload Estimator will provide current and growth recommendations for processor, memory, and disk that satisfy the overall client performance requirements 
Reference: https://www.ibm.com/developerworks/community/blogs/systemssupport/entry/ibm_systems_workload_estimator_and_energy_estimator2?lang=en
Question 10
A customer has ordered a Power System E980. The system has been built, but cannot be shipped. 
What would prevent the system from being shipped?
  1. The mandatory pre-install TDA has not been completed.
  2. The IBM System Support representative has not completed the pre-install site visit.
  3. The opportunity owner has not released it.
  4. A pre-sale TDA discovered correctable issues that have not been corrected.
Correct answer: D
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!