Download Designing HPE Nimble Solutions.passleader.HPE2-K42.2019-03-09.1e.62q.vcex


Download Exam

File Info

Exam Designing HPE Nimble Solutions
Number HPE2-K42
File Name Designing HPE Nimble Solutions.passleader.HPE2-K42.2019-03-09.1e.62q.vcex
Size 696 Kb
Posted March 09, 2019
Downloads 48



How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase
Coupon: EXAMFILESCOM

Coupon: EXAMFILESCOM
With discount: 20%


 
 



Demo Questions

Question 1
Which prerequisites must be fulfilled before starting the array initialization? (Choose three)

  • A: HPE Nimble Windows Toolkit installed on a server/laptop.
  • B: Ensure your laptop/server IP has a static IP address configured on the same subnet as the array management interface.
  • C: Array updated to the latest firmware.
  • D: All switch configurations done like flow control and spanning tree.
  • E: Array registered in InfoSight based on the serial number.
  • F: HPE Service Processor deployed



Question 2
How is SmartReplicate licensed?

  • A: per array
  • B: free of charge
  • C: per target
  • D: based on capacity (per 1TB)



Question 3
What is the maximum number of banks in an AF-Series array?

  • A: 1
  • B: 2
  • C: 3
  • D: 4



Question 4
What is a valid QoS performance setting?

  • A: latency threshold
  • B: IOPS minimum
  • C: IOPS limit
  • D: MB/s minimum



Question 5
What are primary HPE Nimble SmartReplicate components? (Choose three.)

  • A: partner
  • B: snapshot schedule
  • C: replication group
  • D: sync partner
  • E: throttle



Question 6
How should the All-Flash shelf be connected to the controller shelf?

  • A: Cable the All-Flash shelf directly to the last disk shelf.
  • B: Cable the All-Flash shelf directly to the controller shelf.
  • C: Use high performance SAS expanders.
  • D: Cable the All-Flash shelf directly to the first disk shelf.



Question 7
What is the correct power on/off order of the All Flash-Series? (Choose two.)

  • A: power off the controller shelf first, then the expansion shelves
  • B: power on controller shelf first, then the expansion shelves
  • C: power on expansion shelves first, then the controller shelf
  • D: power off the expansion shelves first, then the controller shelf



Question 8
How can controller failover be performed? (Choose two.)

  • A: In CLI, use the command: failover.Perform it online via InfoSight.
  • B: In WebUI, on the array level, click MAKE ACTIVE.
  • C: In OCP, press the Failover button.
  • D: Perform it online via InfoSight.



Question 9
Which kind of licensing approach do HPE Nimble arrays use?

  • A: capacity-based licensing
  • B: controller-based licensing
  • C: all-inclusive licensing
  • D: frame-based licensing



Question 10
List basic replication steps in the correct order. 










ProfExam
PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount..

Get Now!


HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen



HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset